EXTENDED WATER OUTAGE - BROOKLYN
EXTENDED WATER OUTAGE - BROOKLYN
While repairs were underway, crews discovered an additional crack in the pipeline. This needs to be fixed safely before water can be restored, which has extended the outage.

We acknowledge the disruption this has caused and are working at pace to resolve this. Water tankers are on site for essential needs at 45 Connaught Street. We'll have staff door knocking and arranging for bottled water to be delivered to homes if necessary.

Portaloos have been arranged and will be onsite at approximately 7 pm. Addresses to be notified.

Thank you for your patience — we know this is a difficult time of day to be without water, and we really appreciate your understanding

Our team is working as quickly as possible, and we’ll update you again as soon as water restoration is close. Further updates will be provided as we progress with the repair.
In this section
About Us / News And Media / News And Media

News and media

Keep up to date with the latest news from Wellington Water and our mahi here.

 

For media queries contact 021 302 259 or email media@wellingtonwater.co.nz. 

15/01/2020
Wastewater discharge - Martinborough wastewater treatment plant
A discharge of partially treated wastewater has occurred from the Martinborough Wastewater Treatment Plant.

Read More

10/01/2020
Inner Wellington Harbour water quality update
We continue to advise people to avoid swimming or collecting seafood at the Taranaki Diving Platform.

Read More

4/01/2020
Wallace Street closed to traffic for up to six months
From early Sunday morning (5 January 2020), Wallace Street in the central Wellington suburb of Mt Cook will be closed to through traffic until mid-2020.

Read More

3/01/2020
Wallace St closed from Sunday 5 January
From Sunday, Wallace Street will be closed to through traffic until mid-2020.

This will allow us to install major new drinking water pipes in Wallace St that will connect to the future new Omāroro water reservoir.

Read More

27/12/2019
Rāhui lifted from inner Wellington Harbour
The rāhui placed over part of Wellington Harbour following a wastewater overflow last weekend was lifted shortly after 10am this morning.

Read More

23/12/2019
Minor sewer discharge from Eastbourne Sewer
Due to a leak in a wastewater pipe, there is an intermittent discharge of wastewater into the harbour at Sunshine Bay, Eastbourne.

Read More

21/12/2019
Wellington Water office closed 24 December - 3 January
From midday Tuesday 24 December, the Wellington Water office will be closed.

Read More

20/12/2019
Taranaki Whānui place rāhui on Wellington Harbour
Taranaki Whānui have placed a rāhui on swimming in the harbour this afternoon following a major wastewater discharge into the Wellington Harbour.

Read More

20/12/2019
Wastewater network failure leads to call to reduce water use
A collapsed wastewater tunnel in the Wellington CBD means that the central city’s wastewater will begin discharging into the harbour this morning. The likely discharge points are near the dive platform, and Whairepo lagoon.

Read More

17/12/2019
David Bassett re-elected as chair of the Wellington Water Committee
David Bassett was yesterday re-elected chair of the Wellington Water Committee, the shareholder representative body that oversees the water service management company owned by the Wellington, Lower Hutt, Upper Hutt, and Porirua city councils, South Wairarapa District Council and Greater Wellington Regional Council.

Read More